Autor Jon Burdett
E-Mail
Descripción CP 5628 receives final completion details inside the CP Workshops at Entroncamento on 6/10/25. This locomotive has transferred back to CP from Medway, presumably because CP are currently short of a locomotive of this class after the crash of 5613 and current damage to 5619
Foto enviada el: 18/10/2025
Palabras clave: CP, Entroncamento, Electric, locomotive
Tamaño de la foto: 2395 Kb.
Dimensiones de la foto: 1920 x 1280 px.
Enlace a la fotografía:
Enlace BBcode para el foro:

 • SubirAtrás